Construction and Demolition

757-673-0808

Building 143 Specialty Care Clinics

VA Medical Center, Salem, Va.

Renovation of (5) five areas on the 2nd & 3rd floors of existing, Building #143 for use as Specialty Care Clinics to included Neurology, Orthopedic, G.I., Podiatry and Surgical. 3,690 sf on 2nd floor and 1,029 sf on 3rd floor Work included temporary partitions/infection control measures, layout, floor/wall/ceiling demolition, floor preparation for vinyl composition tile, electrical/plumbing fixture demolition, plaster/drywall partition preparation for paint, multi-spec paint, wood door/hardware replacement, new electrical power circuits, new light fixtures, lavatory fixtures, fiber-optic cabling for telephone/data gathering, acoustical ceiling, medical gas system, and HVAC system replacement. All work performed in occupied medical facility without disruption to surrounding medical units. All outages scheduled after hours that might affect work in hospital.

Construction Cost: $1,001,370.80